Now that the shadow station board is complete and the routing set up, I can finalise the details.
This is how the whole thing looks with the shadow station board in place.
It all fits very nicely - sorry about the wonky leg! There are four tracks running the length of the board. These are fed by a three way and a standard point.
The board length is planned against the Rheingold train sitting there. So that the board wasn't unnecessarily long, this train only fits onto the middle track of the four as this is the straightest out of the three way.
To make all of this easy to manage, I have created a set of routes. This was a very simple operation on the ECOS. However, to avoid lots of confusion, I moved all of the staging point controls across to a second page so there is a clear set of operations for the main board and the staging area.
The ECOS is very clever when it comes to setting up points. I put the new three way onto the layout and started to define it. I was worried that I only had a new point operation. I need not have worried because, as soon as I added a three way image to the setting, it understood the change and managing it was extremely simple. Here is the point control/routing page from the ECOS.
No comments:
Post a Comment